Spraying room and supporting facilities of painting production line

Release time: October 8, 2019 14:50:22

The bottom groove, side plate, top plate, air duct plate, water curtain board and maintenance door of water Lian spray cabinet in pindle spray paint production line are made of stainless steel plate. Frequency conversion control emergency stop switch. The automatic low-pressure spray gun of Japan "Iwata" wra-101-082p is adopted. The single gun fixed type and induction switch control the opening action. The gun rack is made of stainless steel. (the primer is equipped with 10 spray guns, and the top coat is equipped with 8 spray guns). Paint barrel and mixer are also required. The lamp tube of UV curing furnace adopts Philips and UV dryer for temperature limiting protection and power-off delay restart function. The inner plate of the furnace is made of stainless steel and the outer plate is made of galvanized steel. The IR of the primer curing oven is output by SSR, and the far-infrared heating tube is automatically controlled at 40 ℃ - 100 ℃. The set temperature can be reached in 10 minutes by on-line temperature adjustment, and the temperature rise should be within 30 minutes when the line is opened. Stainless steel plate and galvanized steel plate are used for outer plate. The electrostatic precipitator room adopts a single gun fixed frame. Forward automatic rotation. Distribution of oil-water separator.

 

Central control system and electrical appliances of spindle painting production line

1. The main switch adopts over-current protection, and the main electric control cabinet adopts standard cabinet.

2. Motor, frequency converter, switch and PLC shall be made of Japanese, Taiwan or European brands.

3. Man machine interface is used for operation.

4. The air conditioner adopts the ceiling type air conditioner.

5. The brand of electrical standard parts shall be famous brands at home and abroad, and the electrical safety of equipment shall meet the requirements of relevant national equipment safety standards.

 

Training requirements for spindle painting production line

Training methods: the supplier must arrange qualified engineer training, guide our personnel to learn the operation and maintenance methods of various machines, prepare training materials, and train relevant technical documents. Customer trained operators can operate independently and skillfully. Maintenance personnel can maintain and repair independently.

 

Spindle painting production line Warranty and equipment maintenance

Automatic painting equipment After the warranty period is over, the paint spraying equipment supplier must assist us to solve the quality problems of the equipment, and the equipment supplier can only charge the maintenance material cost. No matter within the warranty period or after the warranty period, if there are quality problems of the equipment and it is necessary to solve them on site, they must arrive at our site within 24 hours after receiving our notice to help us solve the problems. During the operation of the equipment, in case of host failure, Party B shall arrive at the site within 8 hours; in case of local failure, Party B shall arrive at the site within 24 hours. If Party B fails to repair or deliver the equipment after five days of repair, Party A may entrust others to repair the equipment at the expense of Party B. In case of any economic loss caused to Party A, Party A shall be liable for compensation.

 

Spindle painting production line check before acceptance

For the automatic spraying line of purification part, the temperature in the workshop is required to be 20-26 ℃, the humidity is 40% - 70%, and the air pressure in the spraying room is from - 15pa to - 20Pa. Illumination 350lx-500lx (subject to the test effect parameters used by Party A or the third party inspection organization). The full load and stable operation of the line body shall last for at least 30 days. The 86 * 86 panel production capacity can reach 4000 PCS / h, and the yield rate is more than 95%, and it can be accepted only if it meets all terms of our technical requirements.

 